Project & Heavy Cargo
The loads that do not fit in a container or on a normal trailer.

The problem we solve
Project cargo is a planning discipline more than a transport one. Before anything moves we survey the route, measure the bridges, check the turning circles and secure the permits. The lift itself is the last step, and by the time it happens it should hold no surprises for anyone.

Capabilities
Four areas where the detail decides whether a shipment is straightforward or expensive.
A physical assessment of the full journey covering bridge clearances, road widths, turning radii, overhead lines and surface load capacity, documented before the move is priced.
Abnormal load permits obtained from the relevant Saudi authorities, with police escorts and pilot vehicles arranged where dimensions or weight require them.
Lowbeds, extendables and hydraulic modular trailers configured to the load, with axle load calculations and lashing plans prepared in advance.
Coordination of cranes, roll on roll off operations and site offloading, with a supervisor present for the duration of the lift.
Breakbulk
Breakbulk is what moves when the piece is simply too long, too tall or too heavy for a container. It is slower to load and needs far more planning, and for the right cargo it is the only sensible way to travel.
Anything longer than 12 metres, taller than 2.6, or heavier than a box will safely take. Steel sections, pipe, transformers, generators, prefabricated modules and vessels all travel better loose on a deck than forced into equipment they do not fit.
Breakbulk is craned rather than driven or stuffed, so every piece needs a lifting point, a rigging plan and a stow position agreed with the vessel. We do that work before the cargo reaches the quay, not while a crane waits.
Cargo that shifts at sea damages itself, the ship and everything around it. Lashing calculations and sea fastening drawings are prepared to class requirements and signed off by a marine warranty surveyor where the value calls for it.
A piece that fits on a ship may not fit under a bridge. We survey the inland route before the vessel is booked, because discharging cargo you cannot then move is the most expensive mistake in this trade.
Questions
As early as possible, ideally at tender or procurement stage. Route constraints occasionally rule out an equipment configuration entirely, and knowing that before purchase is far cheaper than discovering it at the port.
We coordinate and supervise lifting operations with specialist crane partners, and provide the method statement, lift plan and on site supervision as part of the scope.
Using hydraulic modular configurations we handle single pieces into the hundreds of tonnes. The practical limit is usually the route rather than the trailer, which is why the survey comes first.
Related services
Most shipments use two or three of our services together. That is where the handovers disappear.
Project & Heavy Cargo
Send the origin, destination, commodity and target date. We will come back with routing options and a landed cost.